+91 96741 60623 info@theparam.com Mon - Sat: 9:00 AM - 6:00 PM
Follow Us:

Electronic Interlocking (EI)

Electronic Interlocking System

Modernizing railway operations by replacing older relay-based systems with advanced Electronic Interlocking (EI) systems to make train movements safer, faster, and more efficient.

Param Enterprises Private Limited, in collaboration with Siemens Ltd., has been involved in the execution of 100+ Electronic Interlocking (EI) systems for Indian Railways as part of railway infrastructure modernization.

Electronic Interlocking uses advanced software-based logic to control railway signals and train movements, reducing dependence on traditional relay-based systems. This helps improve safety, reliability, operational efficiency, and traffic management, while dramatically reducing operational bottlenecks.

Advantages of Upgrading to EI

Significant Space & Maintenance Reduction

Highly integrated solid-state logic cards eliminate vast relay rooms, cutting down physical wear-and-tear failures, minimizing cable requirements (using OFC), and reducing lifetime maintenance costs.

Scalability & Centralized Control

EI systems can easily integrate with advanced Centralised Traffic Control (CTC) systems, enabling railway controllers to monitor and manage train movements from a single, centralised interface.

Our Technology Partners

We collaborate with leading technology providers to integrate best-in-class, globally certified components into our comprehensive signalling solutions like Siemens Ltd.

Siemens Ltd. Strategic Collaboration

Joint execution of 100+ advanced Electronic Interlocking installations and certified OFC based signalling solutions for Indian Railways.

EI Process Workflow Visualization

1 Interlocking Plan (SIP)
2 Schematic Diagram
3 Interface Drawing
4 Logic Design
5 Rack to Rack & Power Wiring
6 I/O & Processor Card Installation
7 Simulation Testing
8 Integrated Testing & Commissioning

Related Projects

Major completed Electronic Interlocking projects

Completed

Eastern Railway (ER)

Bandel, Sahebganj, Pirainti, Sealdah, Kankinara, Naihati and Malda (Yard).

Completed

East Central Railway (ECR)

Samastipur–Darbhanga (11 stations), Valmikinagar–Singrauli (7), Dhanbad Division (10), Sonpur Division (4), Nagaruntari and Sakri (8 each).

Completed

Western Railway (WR)

Mumbai Central — 8 stations, plus 2 additional stations.

Completed

Northern Railway (NR)

Moradabad Division — 20 stations commissioned.

Completed

South East Central Railway (SECR)

Bilaspur.

Modernize with Param

Connect with our dedicated signalling engineers to seamlessly migrate your station's legacy infrastructure to state-of-the-art Electronic Interlocking.